This complex is built in a new residential area of Oba-Cikcilli and will consist of 4 tower blocks of 10 floors high. The complex is near a large shopping center, the weekly market, schools, small supermarkets and at about 900 m from the beach, 5 km from Alanya and 35 km from Gaziapasa airport.
The future owners can not only misjudge the modern architecture, but also the many facilities that are present. The arrangement of the blocks makes that all units look forward to the beautifully landscaped garden with large pool and children pool.
The offered apartments have either 1 or 2 bedrooms, spacious penthouse offering 3 or 4 bedrooms.
Details of apartments:
* steel door with safety lock * PVC windows with double glazing * built-in spotlights in the living room and kitchen area * ceramic floor tiles * MDF kitchen with granite worktop * each room has an air-conditioner * bathroom with shower and toilet * the en-suite bathroom with Jacuzzi
Details dimensions and prices apartments and penthouse:
* with 1 bedroom and 1 bathroom, size: 57 M2. Price ranging from 71,000 to 90,000 Euro. * with 2 bedrooms and 2 bathrooms, size: 91 M2. Price ranging from 97,000 to 131,000 Euros. * with 3 bedrooms and 3 bathrooms, size: 184 to 230 M2. Price ranging from 205,000 to 240,000 Euro. * with 4 bedrooms and 3 bathrooms, size: 221 M2. Price: 225,000 Euros. * Prices include: Iskan (Habitation report), connection electricity- and water meters * Prices do not include: tapu fee: 3.3% of the declared value * Prices do not include: electrical appliances in the kitchen
Complex details:
* large outdoor swimming pool * children swimming pool * heated indoor swimming pool * children's playground * BBQ area * Turkish bath * sauna * steam room * massage rooms * restaurant * mini bar * hairdresser's * bowling * room with table tennis, billiards, playstation * fitness room * central satellite antenna * emergency generator * panoramic elevators * fire escapes * 24 hours security and gardeners * landscaped garden and parking places within the domain * Construction completion: June 2013 |